EAST CHARLESTON — The NorthWoods Stewardship Center Conservation Corps’ Watershed Crew has completed its fourth year implementing water quality improvement projects throughout Vermont.
Since 2015, the NorthWoods Watershed Crew has installed infiltration steps, open-top culverts, rain gardens, dry wells, dripline trenches, water bars, culverts, and many more stormwater management practices that are designed to help prevent sediment and other water quality detractors from entering into the region’s surface waters.
In 2018 alone, the NorthWoods summer youth crew and adult fall pro crew planted 148 perennial plants, installed 65 infiltration steps, 40 waterbars, 13 open-top culverts, a rain garden, a 4,000-gallon vegetated swale, and 5 culvert headers.
They also implemented a fiber coir log with rock toe bank stabilization design on an eroding lakeshore.
While the projects completed had a wide range of partners, components, tool requirements, and scopes, they all shared the common goal of completing vital, practical steps toward improving water quality throughout the state of Vermont.